
| Category |
Description |
Files |
Most Recent |
| Williams #1 Well |
The photographs, video, and narratives within this gallery were taken from a variety of sites across the great state of Texas. POG's President and CEO, through his former company affiliations, had direct involvement in the drilling, acquisition, and production of each of the following wells. The following well descriptions and videos are for informational purposes only and are examples of the types of wells POG intends to develop. -These are pictures of the Williams Well #1 drilled to a depth of 10,750' for natural gas in southwestern Texas during the month of January 2006. |
5 |
Jan 13, 2006 5:02 AM |
| Firecat Well #1 |
These images are from a Two Well Prospect drilling in Grimes County, Texas down to 5,200'. |
6 |
Aug 16, 2005 9:29 PM |
| Davis # 5 Well |
Located in Lavaca County, Texas. Drilling operations began on July 13, 2005, drilling to a total depth of 12,500 feet, this well (Davis #5) directly offsets the Davis #4 well. |
9 |
Jul 14, 2005 8:50 PM |
| Willo Well #1 |
Located in Val Verde County, Texas. Drilling Activities Started December 13, 2004, this is the first of three wells included in the air drilling program. |
13 |
Feb 25, 2005 12:08 AM |
| Bolin Well #1 |
Bolin Well #1 in Waller County, Texas. Drilled to a depth of 12,500 feet in June of 2004. |
8 |
Jul 25, 2004 1:22 AM |
| Yoakum #1 |
Yoakum Well #1drilled in April of 2004 to a total depth of 9,217 feet. |
4 |
May 25, 2004 1:37 AM |
| W9 South Well #1 |
W9 South Well #1 was drilled in December of 2003. |
3 |
Dec 25, 2003 2:41 AM |
| Slick Sands Well #1 |
Slick Sands Well was drilled in September of 2003. |
2 |
Sep 25, 2003 1:46 AM |
| Various Drillings |
A variety of images that depict successful production and innovation within the oil and gas industry. |
6 |
Dec 16, 2004 12:27 AM |
| Video Files |
Description |
Files |
Last Updated |
| Wallis Well #1 |
Wallis Well #1 summary and description |
5 |
Mar 13, 2005 8:13 PM |
| Wallis Well #1 |
Wallis Well #1 summary and description |
5 |
Mar 14, 2005 1:05 AM |
| Willo Well #1 |
Video clips of the Willo Well drilling operation |
5 |
Mar 14, 2005 4:37 AM |
| Willo Well #1 |
Video clips of the Willo Well drilling operation |
5 |
Mar 14, 2005 4:47 AM |
|
|
| Willo Well #1 Images |
"The Prez"
|
Well #3
|
Flowing Well Back
|
Halliburton Frac Job
|
Halliburton Frac job
|
Halliburton Frac job
|
Running a survey.....
|
Here we go!
|
| Bolin Well #1 Images |
N.BolinWell (9)
|
Bolin Well
|
Bolin Well (7)
|
Patterson Rig Sign
|
Bolin Well (4)
|
Bolin Well (6a)
|
Bolin Well (5a)
|
Bolin Well (2)
|
| Yoakum #1 Images |
S.E. Yaokum #1
|
S.E. Yaokum #1
|
S.E. Yaokum #1
|
S.E. Yaokum #1
|
| W9 South Well #1 Images |
W-9 South
|
W-9 South
|
W-9 South
|
|
| Slick Sands Well #1 Images |
Slick Sands
|
Slick Sands
|
| |
| Various Drillings Images |
Wallis Well #1
|
Landers Well #1
|
Southeast Yoakum Well #2
|
Southeast Yoakum Well #1
|
North Bolin Well #1
|
Edwards Reef Horizontal Well #2
|
| |
| Davis # 5 Well Images |
Davis #5 Drilling Rig
|
Davis 5 Rig Floor
|
Davis 5 Hydrocyclones
|
Davis 5 Drilling Rig
|
Davis 5 Superstructure
|
Davis 5 Shale Shakers
|
Davis 5 Draw Works
|
Davis 5 Mud Pumps
|
| Firecat Well #1 Images |
Drilling Rig on the Firecat #1
|
Drilling rig floor
|
Firecat #1 Mud Pumps
|
Firecat Well #1
|
Firecat Rig
|
Rig derrick on Firecat Prospect
|
| |
| Williams #1 Well Images |
Williams Well #1 Rig
|
Drilling Rig Floor
|
Drilling Rig Engines
|
Mud Tanks
|
Blow Out Preventer
|
| | |
Page 1 of 1 pages
|
|